Our team constructs soldier pile walls using two methods. The first strategy is to drive steel beams into soil; the second is to drill holes, fill them with concrete, and then insert the steel beams. Drill Tech has installed over 1,000,000 square feet of soldier pile retaining walls using both driven and drilled beams, with and without tiebacks.