Key Project Highlights
Phillips 66 Refinery SFR Unit 0140 PTU/FRU
Excavation, backfill, and fine grading in preparation for concrete and asphalt paving.
Installation of formwork, reinforcing steel, expansion joints, concrete placement, and joint sealant.
Installation of header board and placement of asphalt.
Excavation, backfill, and placement of bull rock for swales.
Excavation, backfill, formwork, reinforcing steel, and concrete placement for headwall.
Installation of concrete wheel stops.
Sac Sewer BioGen Facility Pile Caps
Layout work from client provided location and elevation survey.
Excavate 4’-0” square x 18” deep around (25) piles, installed by others.
Off haul and dispose of excavated lime treated soil.
Furnish and install formwork and reinforcing steel for pile cap following elevations and slopes from grading drawings.
Furnish and install formwork and reinforcing steel for 8” paving at perimeter of pile cap.
Furnish, place and finish 4,500 psi in 28-day concrete for pile cap and paving to a medium broom surface texture.
Furnish, place and compact 10” of Caltrans class 2 base rock below 8” slab on grade w/ swale.
Remove all formwork.